NC Energy Code Testing: Blower Door & Duct Leakage Requirements

What North Carolina’s residential energy code requires, who can do the testing, and how to pass the first time.

The limits

New homes in North Carolina need documented air leakage and duct leakage results before the certificate of occupancy. Under the NC Energy Conservation Code, the residential limits are:

TestNC code limit (residential)
Blower door (envelope air leakage)5.0 ACH50 or 0.30 CFM50 per sq ft of shell surface area
Total duct leakage5 CFM25 per 100 sq ft of conditioned floor area served
Duct leakage to the outside4 CFM25 per 100 sq ft of conditioned floor area served

A duct system passes with either duct test. Requirements are amended from time to time, so always confirm with your local building department.

Who can test

The code’s testing certificate is completed by a certified HERS rater, a certified BPI envelope professional, or a registered design professional. RAM’s testers are RESNET-certified HERS raters.

How to pass the first time

  • Seal the air barrier before drywall: top plates, penetrations, rim joists, and the garage-to-house wall.
  • Seal ducts at every joint and the air handler, and keep ducts inside conditioned space where you can.
  • Test rough-in ducts before they are buried, when leaks are easy to reach.
  • Going for the Duke HERO rebate? The program’s blower door target is 4.0 ACH50 or lower, tighter than code. Learn more.

Code testing with next-day scheduling for field inspections.